Photo of Lord Henley Lord Henley Parliamentary Under-Secretary (Department for Business, Energy and Industrial Strategy) 6:15, 21 Mehefin 2018

My Lords, I thank noble Lords for their comments and interventions, and I hope I can deal with most of the points raised. I can give an assurance yet again to the noble Lord, Lord Teverson, that OPRED will continue to be the enforcing authority for the offshore oil and gas sector, but the emissions will be monitored by the operators, which have a duty to report them annually to OPRED. OPRED will then take note of them.

The noble Lord, Lord Bruce, intervened with his concerns about the industry, which he voiced in a Question earlier this week on the position of oil and gas in the UK. We understand his concerns about the industry, which is why in the consultation we wanted to know about the concerns of the offshore operators and how they are getting on. As I made clear earlier, when we originally transposed this directive there were no combustion plants of the size we are talking about, but the nature of the extraction of oil and the sort of oil that is being extracted, some of it being much thicker, has meant that there are bigger, heavier machines. That is why we have to bring in these regulations—to deal with that growth. That is what we are doing and why we want to consult on it.

I can assure the noble Lord that Norway will be following us in doing that as this directive applies to EEA states. It is difficult to say how the costs of compliance for us and for Norway may differ, but it is possible that they will be broadly similar, given that its approach to transposition should essentially be the same.

I think the noble Lords, Lord Bruce and Lord Teverson, asked why we were allowing some plant to operate in a non-compliant mode and why we were phasing implementation. This obviously follows the consultation, and OPRED appreciates that it would be difficult for some operators to ensure that some plant, with safety and environmentally critical elements, continued to comply with the relevant deadlines. OPRED certainly wishes to work with the operators in these circumstances on a case-by-case basis in line with the regulations.

Plant plays a critical role in the safe operation of stabilising and processing hydrocarbons by providing the heat and power I referred to in dealing with oil. Should one or more of those plants be prohibited from operating, it could result in implications for safety in processing the hydrocarbons, with the consequence of hydrocarbons then being lost. One has to balance pros and cons in that field, and for that reason it is clear that a degree of phasing has to come in. That is why we made it clear that further medium combustion plants and phased implementation will apply where prescribed for new plant after December 2018, for existing plant with megawatt thermal input of greater than five megawatts but less than 50 megawatts from January 2024, and so on.

Lastly, the noble Lord, Lord Grantchester, asked whether the civil sanctions regulations would apply to these regulations. Yes, civil sanctions regulations will apply to these offshore combustion insulation requirements.

I hope I have dealt with all the questions.