Part of the debate – in the House of Commons am 12:11 pm ar 8 Tachwedd 2023.
Last Wednesday morning, Tata Steel executives in Port Talbot summoned the workforce to tell them of the plan to shut down our entire virgin steel making capability by March 2024. This was utterly shocking, because the understanding had always been that some of the heavy end would continue to function while the electric arc furnace was being constructed, but it takes years to construct an electric arc furnace. The plan is utter madness: it involves importing millions of tonnes of steel from the other side of the world. Electric arc furnaces need the products of virgin steel making, such as iron and iron ore—that is why we need direct reduced iron capability—and the loss of 3,000 jobs over a period like that is completely unacceptable and unnecessary.
When the Government did the deal with Tata Steel about Port Talbot, did they know that Tata was actually proposing not a transition at all, but a potentially lethal cliff edge for our steel industry? Did they know that Tata would be doing that? Does the Minister not agree that the idea of this process is that it should be a transition? It needs to be a bridge, not a potentially lethal cliff edge.